|
Accu-Steel is a leader in providing Cover Buildings for salt and de-icing. Covering salt is challenging because of the corrosive nature of product as well as the demanding environmental requirements. The top design criteria for a salt/de-icing building include: |
|
|



Don't be mis-led. You need to purchase a building that can handle significant snow and wind loads if you are in an area that is purchasing salt and other de-icing materials. While some will tell you they can cut corners in loading because snow does not stick to these buildings, you can see in this picture that snow can accumulate on these structures.